Diese Seite liegt noch nicht auf Deutsch vor. Sie wird auf Englisch angezeigt und ist von der Suche ausgeschlossen.
Industry
Software for teams that work away from a desk
Field software is judged in bad conditions: gloves on, no signal, and a customer waiting. If it is slower than paper, it will not be used.
Ergebnisse
- Data captured at the point of work
- Evidence attached to every visit
- Office visibility without phone calls
- Admin hours returned to operations
Industry
Typische Einsätze
Inspections and audits
Structured forms with photos and scoring.
Job execution
Steps, parts, time and sign-off.
Asset servicing
History, warranty and next-service scheduling.
Unsere Leistungen
- Offline-first mobile apps
- Dynamic forms and checklists
- Photo, signature and GPS capture
- Scheduling and dispatch
- Operational dashboards
Welche Probleme das löst
Paper job sheets arrive days later
Mobile job completion with photos and signatures makes the same-day invoice possible.
Scheduling by phone call
Dispatch with skills, location and travel time turns planning into a decision instead of a negotiation.
No proof of what was done
Time-stamped photos, checklists and signatures per job settle disputes and support warranty claims.
Architektur und Schnittstellen
- Offline-capable mobile with conflict resolution on reconnect.
- Photo capture with compression and reliable background upload.
- Location and travel-time data used for planning, with clear privacy rules.
- Parts and stock movements recorded from the job, not re-entered later.
So läuft die Umsetzung
- 01
Job model
Job types, checklists, required evidence and completion rules defined with the people in the field.
- 02
Mobile first
The field app is built first, because adoption there decides the project.
- 03
Dispatch
Planning board with skills, travel and priority, plus manual override.
- 04
Back-office
Invoicing, parts usage and reporting connected to completed jobs.
Realistischer Zeitplan
Weeks 1–2
Job model and field workflow.
Weeks 3–9
Mobile app and dispatch in pilot use with real crews.
Weeks 10–15
Integrations, reporting and full rollout.
Was den Preis bestimmt
Offline requirements
Full offline working with sync is one of the most expensive mobile requirements and must be decided early.
Scheduling intelligence
Manual dispatch is quick; optimised routing and skills matching is its own project.
Back-office integration
Invoicing, stock and payroll connections add scope per system.
Wo Projekte scheitern
Field teams reject the app
Pilot with real crews in week three; anything that adds time to their day is redesigned before rollout.
Poor connectivity
Offline behaviour is tested in the actual conditions the crews work in, not on office wifi.
FAQ
Häufige Fragen
Which devices do you support?+
iOS and Android phones and tablets, including rugged devices and enterprise distribution.
How long does rollout take?+
Typically a pilot crew within weeks, full rollout once the field team confirms it is faster than the current method.
Verwandte Seiten
You already have the idea. Let's define what comes next.
Available in 12 languages
Avenryx Systems