Fixed price vs time and materials: who carries the risk
Fixed price transfers risk to the supplier — who prices it in. Time and materials keeps it with you and rewards discovery. Neither is honest without a clear scope.
Outcomes
- Fixed price needs a documented specification to be meaningful
- Time and materials needs a trusted supplier and an engaged product owner
- Capped time and materials is a workable middle ground
- Change control matters more than the model chosen
- Discovery is best paid separately under either model
Problems this solves
Fixed price needs fixed scope
Without detailed scope, the risk premium in a fixed price exceeds what the flexibility is worth.
Time and materials needs trust and visibility
Sprint demos, burn reporting and a change log make it controllable rather than open-ended.
Change requests become adversarial
Fixed price pushes both sides into arguing about interpretation instead of building.
How delivery runs
- 01
Fixed-price discovery
Discovery itself is fixed price — it is well understood and produces the scope.
- 02
Fixed-price first phase
Where scope is clear after discovery, phase one is quoted fixed.
- 03
Time and materials afterwards
Later phases run on measured velocity with a capped monthly spend.
- 04
Written change control
Every addition estimated and scheduled explicitly, in both models.
Build or buy
Buy something existing when
- Fixed price for well-defined, self-contained deliverables
Build custom when
- Time and materials with a cap for evolving products
What moves the price
Scope certainty
The less certain the scope, the larger the risk premium in any fixed price.
Integration unknowns
Third-party systems you do not control are difficult to fix-price honestly.
Change appetite
If you expect to learn and adjust, fixed price works against you.
Where projects go wrong
Fixed price built on a thin brief
Expect quality to absorb the difference; insist on discovery first.
Uncapped time and materials
Always agree a monthly cap and a stop-or-continue review point.
FAQ
Questions buyers ask
Which do you recommend?+
Fixed price when scope is knowable, capacity-based when it is genuinely exploratory. We say which before quoting.
How are changes handled?+
A written change with impact on cost and date, approved before work starts.