Projektschätzung erhaltenBeratung anfragen

Diese Seite liegt noch nicht auf Deutsch vor. Sie wird auf Englisch angezeigt und ist von der Suche ausgeschlossen.

Pricing

What an MVP costs when scope is disciplined

MVP budgets overrun for one reason: the scope was never really minimum. The number below assumes one core loop, one user type and no integrations that are not essential to proving demand.

Ergebnisse

  • A first release inside 8 to 14 weeks
  • Evidence for the next funding decision
  • A codebase that continues rather than restarts
  • An indicative estimate in minutes

Pricing

Typische Einsätze

Prototype and validation

Clickable prototype plus a narrow build — €25,000 to €40,000.

Market-ready MVP

Real users, payments, analytics — €40,000 to €90,000.

Funded MVP

Investor-grade product with integrations — €90,000 upwards.

Unsere Leistungen

  • Number of user types
  • Whether payment is in the first release
  • Integrations required to prove value
  • Design depth and brand expectations
  • Speed of launch

Realistischer Zeitplan

Definition

1–2 weeks: riskiest assumption, cut list, flows.

Build

8–12 weeks for one core journey, instrumented.

Learn

2–4 weeks of real usage before deciding what comes next.

Was den Preis bestimmt

Number of user types

One user type keeps an MVP an MVP; three sides make it a platform.

Payments

Taking money adds checkout, refunds, failures and reconciliation.

Design depth

A clean system-based interface is quick; bespoke brand design is an optional addition.

Integrations

Every external service in v1 adds time that could be spent learning from users.

Wo Projekte scheitern

Spending the whole budget on v1

Keep a reserve for what launch teaches you; that is where the value of an MVP is realised.

Calling a platform an MVP

Scope discipline is the difference between a 10-week launch and a 10-month one.

FAQ

Häufige Fragen

What should we cut first?+

Admin tooling, secondary user types and reporting. You can operate those manually while there are ten customers.

Will we need to rebuild?+

Not if the MVP is built properly. We cut scope, not engineering standards.

You already have the idea. Let's define what comes next.

Available in 12 languages

mvp development cost