Replacing a legacy system without a day of downtime

A big-bang cutover concentrates all the risk into one weekend. Phased migration spreads it into small, reversible steps — slower on paper, faster in practice.

Outcomes

  • Route traffic through a facade both systems sit behind
  • Move one capability at a time, starting with low risk
  • Dual-run and reconcile before switching the source of truth
  • Keep a rollback for every phase, and rehearse it
  • Decommission only after a full reporting cycle has passed

Problems this solves

Big-bang cut-over risks the business

Replacing in slices keeps the old system live until each piece is proven in production.

Everything reads the old database

Downstream consumers are inventoried and given a stable interface during transition.

Rules exist only in the old code

Recovered, documented and covered by tests before the slice is replaced.

Architecture and integration

  • Routing layer in front of the legacy system so traffic can be moved per slice.
  • Change-data-capture or dual writes to keep data consistent during transition.
  • Comparison harness logging differences between old and new behaviour.
  • Read-only archive of the legacy system retained after decommissioning.

How delivery runs

  1. 01

    Inventory and slice plan

    Identify seams where a piece can be replaced independently.

  2. 02

    Route traffic gradually

    New implementation runs behind a routing layer, with a percentage of traffic and instant fallback.

  3. 03

    Run in parallel

    Both systems process, results compared, differences investigated before switching fully.

  4. 04

    Decommission

    Old slice switched off only after a defined period of clean operation.

What moves the price

Number of slices

Each slice carries its own parallel run and verification effort.

Data synchronisation

Keeping two systems consistent during transition is real engineering, not overhead.

Consumer count

Every downstream system reading the legacy data must be handled.

Where projects go wrong

Parallel running forever

Each slice gets a decommission date agreed up front.

Silent behaviour differences

The comparison harness makes differences visible before the switch, not after.

FAQ

Questions buyers ask

Is phasing more expensive?+

Slightly more engineering, considerably less business risk. For systems that cannot stop, it is the cheaper option overall.

How long does a full migration take?+

Typically six to eighteen months depending on module count and data quality — with value delivered throughout.