Bu sayfa henüz Türkçe değil; İngilizce gösteriliyor ve arama sonuçlarından hariç tutuluyor.
Pricing
What an MVP costs when scope is disciplined
MVP budgets overrun for one reason: the scope was never really minimum. The number below assumes one core loop, one user type and no integrations that are not essential to proving demand.
Sonuçlar
- A first release inside 8 to 14 weeks
- Evidence for the next funding decision
- A codebase that continues rather than restarts
- An indicative estimate in minutes
Pricing
Kullanım alanları
Prototype and validation
Clickable prototype plus a narrow build — €25,000 to €40,000.
Market-ready MVP
Real users, payments, analytics — €40,000 to €90,000.
Funded MVP
Investor-grade product with integrations — €90,000 upwards.
Neler teslim ediyoruz
- Number of user types
- Whether payment is in the first release
- Integrations required to prove value
- Design depth and brand expectations
- Speed of launch
Realistic timeline
Definition
1–2 weeks: riskiest assumption, cut list, flows.
Build
8–12 weeks for one core journey, instrumented.
Learn
2–4 weeks of real usage before deciding what comes next.
What moves the price
Number of user types
One user type keeps an MVP an MVP; three sides make it a platform.
Payments
Taking money adds checkout, refunds, failures and reconciliation.
Design depth
A clean system-based interface is quick; bespoke brand design is an optional addition.
Integrations
Every external service in v1 adds time that could be spent learning from users.
Where projects go wrong
Spending the whole budget on v1
Keep a reserve for what launch teaches you; that is where the value of an MVP is realised.
Calling a platform an MVP
Scope discipline is the difference between a 10-week launch and a 10-month one.
FAQ
Sık sorulanlar
What should we cut first?+
Admin tooling, secondary user types and reporting. You can operate those manually while there are ten customers.
Will we need to rebuild?+
Not if the MVP is built properly. We cut scope, not engineering standards.
Avenryx Systems